Details
-
New Feature
-
Status: Done
-
Medium
-
Resolution: Fixed
-
None
-
7
-
Yes
-
Yes
-
Yes
-
Server Features
Description
User story:
As a PMM user, I need to be able to specify the retry info related to the scheduled backup job, when I'm scheduling a backup so that PMM automatically retries accordingly whenever something goes wrong with the job execution.
UI/UX:
see the design attached to https://jira.percona.com/browse/PMM-8155
Acceptance criteria
- This is about Automatic retries
- the User can specify the max number of retries to be executed
- the User can specify the time interval between retries
Out of scope:
- Manually triggered retries
How to test:
TBD
Details:
TBD