Uploaded image for project: 'Percona Monitoring and Management'
  1. Percona Monitoring and Management
  2. PMM-8396

Backup Management: Add an ability to specify the number of retries for Scheduled backups before operation fails

Details

    • 7
    • Yes
    • Yes
    • Yes
    • Server Features

    Description

      User story:
      As a PMM user, I need to be able to specify the retry info related to the scheduled backup job,  when I'm scheduling a backup so that PMM automatically retries accordingly whenever something goes wrong with the job execution.

      UI/UX:
      see the design attached to https://jira.percona.com/browse/PMM-8155

      Acceptance criteria

      • This is about Automatic retries
      • the User can specify the max number of retries to be executed
      • the User can specify the time interval between retries¬†

      Out of scope:

      • Manually triggered retries

      How to test:
      TBD

      Details:
      TBD

      Attachments

        Issue Links

          Activity

            People

              paul.jacobs Paul Jacobs (Inactive)
              holman.romero Holman Romero
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Smart Checklist